KitLog pro

Powered By Kitlog Pro v2.0

Jamess Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  10-5-2021
Number of Hours:  6.00
Manual Reference:  QB double check
Brief Description:  QB double check

Today I spent better part of 6 hours double checking the QB (Van's build up) of Fuselage and lifted the dolly for moving around the hanger to height of 21 inchs at the tail bulk head and about 12 inchs off the ground at cabin /firewall so can reach now I reach inside and not have to have a ladder but don't have to be bent over to work on firewall or side steps install
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.